PlatformZERO™

 

 

New platform technology extended a unique welcome to Rail Live visitors

Plura's zero-possession platform extension system* was unveiled at Rail Live in June 2022

This has been permanently​​​​​​ installed on site to continue to welcome visitors in years to come.

 

Visitors that arrived at Rail Live on the new direct service from Birmingham alighted at PlatformZEROTM, a unique permanent platform built within the show ground at the Long Marston Rail Innovation Centre.  Designed and installed by Plura Innovations in collaboration with its development partners: consulting engineers, ECSL, and rail contractor, CSM Projects, the breakthrough modular platform is a fully integrated and compliant zero track possession system* which can be used on both new build and extentsion projects.

*The term ‘possession’ in this context refers to the process of closing an operational railway line and isolating it (if electrified) for the purpose of carrying out construction or maintenance work. A possession is therefore disruptive and reduces operational line time. The PlatformZERO™ requires zero possession time.

Designed around a 2.7m wide repeating modular section, PlatformZEROTM uses an innovative piling and sliding GRP sub-structure that allows all first-phase construction work to be completed away from a live track environment, behind a Vortok Rail Safety Barrier, ensuring complete safety and eliminating any disruption to train operations. This approach minimises costs, forward planning and construction time with Clive Marriott stating, “a typical 40m platform extension is capable of completion in under two weeks!”

“The use of pultruded composite profiles, produced by us in the UK, in the construction of the sub-base, surface deck and rear of platform fence makes the finished structure fire-resistant, extremely lightweight and strong,” says Andrew Wright, Managing Director of Plura Innovations. “PlatformZEROTM is designed to be entirely hand installed and without the need for on-track plant or heavy lifting equipment on site. Handling and assembly are therefore straightforward compared with conventional approaches, some of which require heavy lifting equipment, and, given the durability of the materials, the system has an operational life of more than 60 years.”

With the sub-structure in place, adjustable head caps on the piles allow precise alignment of the finished platform to gauge with the Passenger Train Interface. High-strength pultruded surface deck panels complete the platform. Each surfaced with class leading GRIPfastTM embedded grit which provides a ‘near-diamond hard’ non-slip finish, the panels are supplied with factory-finished colour graphics and tactile surfacing.

When complete, the platform fully complies with the Network Rail standard for load bearing structures (5kN/m2) with L/300 minimum deflection and passes the minimum 25-minute fire retardancy requirement. The fire integrity of the finished structure can be further enhanced by perimeter barrier panels that surround the sub-base.

“The simplicity of its modular design allows quick completion of the platform once the deck is in place,” says Andrew Wright. “Installation of fence posts during first-phase construction allows quick completion of rear and end of platform fence and end of platform gates and stairs which are incorporated seamlessly into the design using Plura’s POLYsadeTM the UK Rail industries preferred Touchsafe GRP fencing system. In addition, an integral drainage channel is installed at the rear of the platform during the deck lay, and all electrical & cable conduits are pre-installed.”

Partners, Plura Innovations, ECSL and CSM Projects offer PlatformZEROTM as a complete UK manufactured turn-key design, supply and install solution.

To arrange your own visit and guided tour of PlatformZEROTM at Long Marston, please get in touch.

  • Durable
  • Low maintenance
  • Non slip

Features & Benefits

It is Plura’s understanding (based on its industry knowledge) that PlatformZEROTM is the UK's first zero possession platform system. 

GRIPfast™ surface

This best in class, market leading, near diamond hard finish provides peerless durability.

Low maintenance and long life

PlatformZERO™ will not corrode & can be jet-washed to keep its just installed looks.

Lightweight

All GRP panels are easily handled and fast to install.

Product resources

Learn more about PlatformZERO™ with the product resources. For more information on any of our products or services, please get in touch!

Proudly supporting our extensive client base

I’d definitely use them again on other projects.

John Smith
Project Manager, Carver Engineering

Plura Polydeck have been extremely helpful and professional from start to finish on this project. The communication was spot on and the final product looks brilliant.

Mark Churchouse
Senior Quantity Surveyor, Taylor Wimpey Southern Counties

Product enquiry

To enquire about a product, or for more information, please use the form below or contact us.

Notice area

Notice area

Notice area

Notice area

Notice area